Every number on this site is calculated from a named dataset, cited from a source, or calculated from your own input. Here is how.

Source and licence

Sample data: LBNL's public simulated chiller plant. The Plant Check samples and every sample-data figure on this site use two files from this public research dataset:

Granderson, J., Lin, G., Chen, Y., Casillas, A., et al. LBNL Fault Detection and Diagnostics Datasets. Lawrence Berkeley National Laboratory, 2022. Open Energy Data Initiative. https://doi.org/10.25984/1881324 (CC BY 4.0)

  • Licence: CC BY 4.0.
  • Changes: July slices, resampled from 1-minute values to 15-minute averages; point names unchanged.

The two files:

  • Sample plant, no faults (July): Three chillers and three cooling towers serving a 12-storey Chicago office, fault-free case.
  • Sample plant, cooling-tower fouling (July): The same plant with cooling tower 1's heat-transfer coefficient reduced to 65% (LBNL's 'fouling' fault).

The dataset

Both files have the same 77 points and a timestamp column, Datetime, with LBNL's point names as published.

Files

FileRowsIntervalFirst rowLast rowPeriod
Sample plant, no faults (July)2,97615 minJul 1, 2018Jul 31, 201831.0 days
Sample plant, cooling-tower fouling (July)2,97615 minJul 1, 2018Jul 31, 201831.0 days

Points by prefix

PrefixPointsPoint names
CHL27CHL_CD_FLOW_1–3, CHL_COMP_SPD_CTRL_1–3, CHL_CW_FLOW_1–3, CHL_POW_1–3, CHL_SWCD_TEMP_1–3, CHL_RW_TEMP_1–3, CHL_STA_1–3, CHL_RWCD_TEMP_1–3, CHL_SW_TEMP_1–3
CT22CT_FAN_SPD_1–3, CT_FAN_SPD_CTRL_1–3, CT_FLOW_1–3, CT_POW_1–3, CT_RW_TEMP_1–3, CT_STA_1–3, CT_SW_TEMPSPT, CT_SW_TEMP_1–3
CWL_SEC12CWL_SEC_CW_FLOW, CWL_SEC_DP, CWL_SEC_DPSPT, CWL_SEC_LOAD, CWL_SEC_PM_POW_1–2, CWL_SEC_PM_SPD_1–2, CWL_SEC_PM_STA_1–2, CWL_SEC_RW_TEMP, CWL_SEC_SW_TEMP
CWL_PRI7CWL_PRI_CW_FLOW, CWL_PRI_PM_POW_1–3, CWL_PRI_RW_TEMP, CWL_PRI_SW_TEMP, CWL_PRI_SW_TEMPSPT
CDWL6CDWL_CW_FLOW, CDWL_PM_POW_1–3, CDWL_RW_TEMP, CDWL_SW_TEMP
OA2OA_TEMP, OA_TEMP_WB
TWV1TWV_CTRL
All points77

The 77 points include no make-up, blowdown, conductivity or chemistry points, so this site shows no water-side numbers for the sample plant. Water-side numbers appear only in the calculators, driven by your own inputs.

The OA_TEMP / OA_TEMP_WB finding

LBNL's point inventory labels OA_TEMP as outdoor dry-bulb temperature and OA_TEMP_WB as outdoor wet-bulb temperature. Mapped by those labels in the fouled-tower file, Plant Check's physics check reports:

PHYSICS CHECK

Wet-bulb is above dry-bulb in 98% of rows, which is physically impossible. The two columns may be swapped or mislabelled in the export.

Wet-bulb is not above dry-bulb · OA_TEMP_WB vs OA_TEMP · measured 97.8% of rows

By name vs reference mapping

REFERENCE MAPPING
PointGoing by the labelReference mapping
OA_TEMPOutdoor dry-bulb temperatureOutdoor wet-bulb temperature
OA_TEMP_WBOutdoor wet-bulb temperatureOutdoor dry-bulb temperature

The reference assignment comes from the plant's documented control sequence, LBNL inventory §1.2, Eq. 3 (tower leaving-water setpoint = wet-bulb + 8 °F). Over 2,976 rows, the setpoint column CT_SW_TEMPSPT minus each outdoor column:

Control-sequence evidence

CALCULATED FROM THE DATA
DifferenceMeanStandard deviation
CT_SW_TEMPSPT − OA_TEMP7.93 °F0.76 °F
CT_SW_TEMPSPT − OA_TEMP_WB1.16 °F4.86 °F

The setpoint follows OA_TEMP at a mean offset of 7.93 °F with a standard deviation of 0.76 °F, as the sequence requires of the wet-bulb; against OA_TEMP_WB the standard deviation is 4.86 °F.

Plant Check's check flags the pair when mapped by name; our reference mapping assigns them by the control-sequence evidence. The check never changes a mapping. The files are used as LBNL published them.

Physics checks

Plant Check runs 6 fixed engineering rules on every proposed mapping and again on the mapping you confirm. A rule that fires shows its warning; it never changes a mapping.

Below is every check on the fouled-tower file with the points mapped by their inventory labels: 24 checks, 1 flagged. With the reference mapping the same file gives 24 checks, 0 flagged.

Mapped by point name · Sample plant, cooling-tower fouling (July)

PHYSICS CHECK
CheckedMeasuredResult
Temperatures are plausibleEvery mapped temperature stays within −20 to 140 °F after unit conversion.
Chilled-water supply temperatureCWL_PRI_SW_TEMP42.8–54.1 °F✓ PASS
Chilled-water return temperatureCWL_PRI_RW_TEMP42.9–62.8 °F✓ PASS
Condenser water to towerCDWL_RW_TEMP60.2–96.6 °F✓ PASS
Condenser water from towerCDWL_SW_TEMP60.0–88.3 °F✓ PASS
Outdoor wet-bulb temperatureOA_TEMP_WB53.2–94.8 °F✓ PASS
Outdoor dry-bulb temperatureOA_TEMP51.5–80.4 °F✓ PASS
Chilled-water supply is colder than returnFlags when supply is warmer than return in more than half the rows.
Chilled-water supply temperatureCWL_PRI_SW_TEMP vs CWL_PRI_RW_TEMP0.0% of rows✓ PASS
Water from the tower is colder than water to itFlags when water from the tower is warmer than water to the tower in more than half the rows.
Condenser water from towerCDWL_SW_TEMP vs CDWL_RW_TEMP0.0% of rows✓ PASS
Wet-bulb is not above dry-bulbFlags when wet-bulb exceeds dry-bulb in more than 5% of rows.
Outdoor wet-bulb temperatureOA_TEMP_WB vs OA_TEMP97.8% of rows⚠ FLAG
Wet-bulb is above dry-bulb in 98% of rows, which is physically impossible. The two columns may be swapped or mislabelled in the export.
Fan speed set as a fraction stays at or below 1Flags when a fan speed mapped as a fraction exceeds 1.05.
Cooling-tower fan speedCT_FAN_SPD_1max 1.00✓ PASS
Power readings are not negativeFlags a power column with negative readings in more than 1% of rows.
CHL_POW_10.0% of rows negative✓ PASS
CHL_POW_20.0% of rows negative✓ PASS
CHL_POW_30.0% of rows negative✓ PASS
CT_POW_10.0% of rows negative✓ PASS
CT_POW_20.0% of rows negative✓ PASS
CT_POW_30.0% of rows negative✓ PASS
CDWL_PM_POW_10.0% of rows negative✓ PASS
CDWL_PM_POW_20.0% of rows negative✓ PASS
CDWL_PM_POW_30.0% of rows negative✓ PASS
CWL_PRI_PM_POW_10.0% of rows negative✓ PASS
CWL_PRI_PM_POW_20.0% of rows negative✓ PASS
CWL_PRI_PM_POW_30.0% of rows negative✓ PASS
CWL_SEC_PM_POW_10.0% of rows negative✓ PASS
CWL_SEC_PM_POW_20.0% of rows negative✓ PASS

Metric definitions

Plant Check calculates every number it reports directly from the points you confirm, with the formulas below. It reports a metric only when the points it needs are mapped: the base requirement, plus any listed against it. We verify that each requirement is both sufficient and necessary.

Base requirement, every metricTimestamp and Chiller power, plus either Chilled-water flow, Chilled-water supply temperature and Chilled-water return temperature, or Measured cooling load.

MetricUnitNeeds beyond the baseNote
Period covereddaysBase onlynone
Sampling intervalminBase onlynone
Hours with chillers runninghBase onlynone
Chiller electricitykWhBase onlynone
Cooling deliveredton-hBase onlyFrom chilled-water flow x delta-T when those points are mapped, otherwise from the measured load point.
Average load while runningtonsBase onlynone
Peak loadtonsBase onlynone
Chiller efficiency (energy-weighted)kW/tonBase onlyTotal chiller kWh divided by total ton-hours.
Chiller kW/ton, best 10% of running intervalskW/tonBase onlynone
Chiller kW/ton, median running intervalkW/tonBase onlynone
Chiller kW/ton, worst 10% of running intervalskW/tonBase onlynone
Cooling-tower fan electricitykWhCooling-tower fan powernone
Tower fan energy per ton-hourWh/ton-hCooling-tower fan powernone
Pump electricitykWhPump powernone
Whole-plant efficiency (chillers + towers + pumps mapped)kW/tonat least one of: Cooling-tower fan power or Pump powernone
Hours with chillers on below 5% of peak loadhBase onlynone
Plant electricity used in those standby hourskWhBase onlyChillers plus any mapped towers and pumps.
Share of plant electricity used in standby hours%Base onlynone
Chilled-water delta-T (median while running)°FChilled-water supply temperature and Chilled-water return temperaturenone
Lift (median while running)°FCondenser water to tower and Chilled-water supply temperatureCondenser water leaving chillers minus chilled water leaving chillers.
Condenser-water range (median while running)°FCondenser water to tower and Condenser water from towernone
Tower approach to wet-bulb (median while running)°FCondenser water from tower and Outdoor wet-bulb temperaturenone
Tower approach, worst 10% of running intervals°FCondenser water from tower and Outdoor wet-bulb temperaturenone
Mapped tower fan speed (median while running)%Cooling-tower fan speednone
Share of running hours with the mapped tower fan at ≥95% speed%Cooling-tower fan speednone

The number rule

After the metrics are calculated, AI writes the explanation: a headline, findings, questions for the site and caveats. It is given the calculated metrics, notes on missing points, and which physics checks flagged. For the samples it is told where the data came from, but not which fault was introduced, so an explanation that points at the towers got there from the numbers. Apart from the metric values themselves, nothing it is given states a number: labels that name a percentile or threshold are reworded, and a flagged check is described without its measured share.

The rule it works under: it may not write a number, in digits or in words. Where it needs a figure, it cites one of the calculated metrics, and we insert the value and unit.

Every explanation is checked before you see it. A digit, a number word (such as eight, forty-four, half, twice, doubled or percent), or a citation of a figure we did not calculate rejects the whole explanation, and you see an error instead. In an accepted explanation, every number traces to a calculated metric.

Example drafts and what the check did with them

EXAMPLE DRAFTS
  1. Draft
    Approach sits at [Tower approach to wet-bulb (median while running)] while running.
    Published as
    Approach sits at 8.7 °F while running.
    ✓ PUBLISHED
  2. Draft
    Approach is about 8 degrees.
    Why it was rejected
    It typed a number itself.
    ✕ REJECTED
  3. Draft
    Approach is about eight degrees.
    Why it was rejected
    It wrote a number as a word ('eight').
    ✕ REJECTED
  4. Draft
    Savings of [dollars saved: not a figure we calculate].
    Why it was rejected
    It cited a figure we never calculated.
    ✕ REJECTED
Example drafts, each run through the same check every Plant Check explanation must pass. The published value is the one calculated for the fouled-tower sample. These are examples we wrote, not AI output.

These drafts are examples we wrote, not AI output. AI output appears on this site only from a recorded run, tagged Written by AI with its date, and shown unedited.

Reference mapping and AI output

In Plant Check, AI proposes a role and unit for every point, from its name and a profile of its values. The AI proposes and you confirm: you check or change each row before anything is calculated.

The sample-data figures on this site don't use an AI proposal. They use a reference mapping we wrote from LBNL's point inventory and checked against the data's physics: 23 of the 77 points carry a role.

Reference mapping · Sample plant, cooling-tower fouling (July)

REFERENCE MAPPING
RolePointsUnit
TimestampDatetimedatetime
Chiller powerCHL_POW_1–3kW
Cooling-tower fan powerCT_POW_1–3kW
Pump powerCDWL_PM_POW_1–3, CWL_PRI_PM_POW_1–3, CWL_SEC_PM_POW_1–2kW
Measured cooling loadCWL_SEC_LOADW
Chilled-water flowCWL_PRI_CW_FLOWgpm
Chilled-water supply temperatureCWL_PRI_SW_TEMPdegF
Chilled-water return temperatureCWL_PRI_RW_TEMPdegF
Condenser water to towerCDWL_RW_TEMPdegF
Condenser water from towerCDWL_SW_TEMPdegF
Cooling-tower fan speedCT_FAN_SPD_1fraction
Outdoor wet-bulb temperatureOA_TEMPdegF
Outdoor dry-bulb temperatureOA_TEMP_WBdegF
Not used54 points. Setpoints, statuses, per-equipment duplicates of plant-level points, pressures, control signals and anything else the analysis does not need.

One recorded AI run per file, shown unedited: how its proposed mapping compares with the reference mapping.

Sample plant, no faults (July)

WRITTEN BY AI · 2026-09-30 · UNEDITED

78 of 78 points: the AI proposed the same role and unit as the reference mapping.

No differences.

Sample plant, cooling-tower fouling (July)

WRITTEN BY AI · 2026-09-30 · UNEDITED

78 of 78 points: the AI proposed the same role and unit as the reference mapping.

No differences.

Check our numbers

The dataset is public. Download it from the DOI above, take the July slices at 15-minute averages, and apply the reference mapping and the metric definitions above to reproduce any sample-data number on this site. Questions about a number? Write to us at hello@gigabiome.com.